Been busy this week. I typically get to work in the garage after 8pm; when the boys are in bed.
I've been trying to make some serious progress too, since I only will be in the garage for 3-ish hours at a time (until the weekend).
More gratuitous clean engine bay pics:
Header panel, and wiper cowl all removed, along with the fan shroud and some other stuff.
Intake manifold is out. and everything up top is disconnected, with the load leveler installed.
The drive train should be removed some time this weekend.
-ryan s.
I've been trying to make some serious progress too, since I only will be in the garage for 3-ish hours at a time (until the weekend).
More gratuitous clean engine bay pics:
Header panel, and wiper cowl all removed, along with the fan shroud and some other stuff.
Intake manifold is out. and everything up top is disconnected, with the load leveler installed.
The drive train should be removed some time this weekend.
-ryan s.
Comment